Rudder assembly

September 23 and 29: Continuing on with assembling the rudder after priming.

Had another of what I thought was an “oops” moment when I saw that I placed the shop head of rivets on the rudder spar on the side of the thinner metal. I took pictures and emailed Vans support asking if I needed to drill these out and replace them.

Sterling replied that the manufactured/shop head standard is not mandatory, as universal head rivets have the same strength no matter the head orientation, and to build on.

Leave a Reply

Your email address will not be published. Required fields are marked *