Assembling VS

September 15: I was pleasantly surprised at how well the AKZO went on. It sprays easily, dries quickly so you can flip the parts and spray the other side, and cure hard as a rock.

Set the very first of tens of thousands of rivets today.

Due to the particulars of the Canadian amateur-built process, I cannot enclose any structure until an inspector from the MD-RA (Ministry of Transport) comes out to take a look at everything. As these inspections aren’t cheap, and they have to drive a couple of hours to get here, most builders wait until they have their empennage and wings nearly complete before scheduling.

This means for the vertical stabilizer, I will leave the rear spar unattached, but will rivet the rest of the structure and skin together. As for the rudder, I will have to give my assigned inspector a call as the rudder spar has lightening holes which will allow him access. But I will defer to his instructions.

Since winter is rapidly approaching, I’m trying to get as much priming done as possible while the weather cooperates, and then spending the winter months in the basement riveting everything together.

Leave a Reply

Your email address will not be published. Required fields are marked *