It begins: VS Front Spar

August 24: Started with VS-702. Prepped spar doubler, clecoed into place and drilled the first holes. Finished drilling, trimmed bottom edge of front spar per plans, deburred and dimpled.

I set everything aside until I got a big enough batch to prime with AKZO.

Leave a Reply